PostYou are now at: Home » Products » Construction & Decoration »

Short Blast Bailey Steel Bridge Anti - Rust Simple Truss Bridge For Construction

Click image to view original image
Brand: SJ-Bridge
Price: 1000.00USD/Piece
Min.Order:
Supply
Delivery: Shipment within 3 days since the date of payment
Address: China
Valid until: Never Expire
Updated on: 2017-02-20 13:06
Hits: 411227
Enquiry
Company Detail
 
 
Details

Short Blast Temporary Construction Bridge/ Bailey Bridge For Construction

 

 

Bailey Platform Specification

 

Application of Bailey Platform:

 

Platform Area:No-limitation in width and length

 

Usage:Muti-span Platform,Muti-span trestle bridge.

 

Panel Dimension:3000MMX1500MM Or 3048MMX2134MM

 

Structure:Truss Panels connected by frames

 

Loading Capacity: People Walking;truck-40,50,HS25,BS5400,Trailer-80,etc

 

Bailey platform is a extention type of bailey panel Deck- bridge,its biggest advantage is that width can extended to tens of meters.

It is a type of bridge system that can be diassembled and rapidly erected. The whole bridge is welded with high-tensile strength steel. The girder is light weight composite panels and the panels are connected by panel connection pins. The conversion between the parts is easy and they are lightweight. It is easy to assemble or disassemble and transport them. It can also be assembled into different forms of panel bridges according to their span length and transportation requirement. So, it has been widely applied as a more developed and guaranteed panel bridges for emergency transportation. 

 

 

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.

 

 

Total: 0 [Show All]  Related Reviews
 
More »Our Others Products

[ ProductsSearch ]  [ Add To Favourite ]  [ Tell Friends ]  [ Print Content ]  [ Violation Report ]  [ Close Window ]