PostYou are now at: Home » Products » Machinery »

Semi - Automatical PU Sponge Foam Making Machine For Furniture Mattress

Click image to view original image
Brand: QHMACH
Price: 1000.00USD/Piece
Min.Order:
Supply
Delivery: Shipment within 3 days since the date of payment
Address: China
Valid until: Never Expire
Updated on: 2017-03-28 13:15
Hits: 237107
Enquiry
Company Detail
 
 
Details

Semi - Automatical PU Sponge Foam Making Machine For Furniture Mattress

 

QHFP-007 Semi-automatic Foaming Machine

  • Large material automatically measure(measuring is automatically set)
  • Material temperature automatic control
  • Non-stick surface treatment on stirring shaft and stirring barrel
  • imported inverter and PLC automatic control
  • Be equipped with stainless steel small feed tank (manually add small material)

Main specification

 

 Dimension  L2.8 m×W1.5m×H2.5m
 Foam mould size(can be adjusted)  W1500-2000×L2000-3000×H1200 two sets
 Foaming material Group  7 groups, man-machine interface control
 Foaming height  Max 1200mm
 Foaming density  8Kg/m³100kg/m³
 Foaming speed  2000r/min7000r/min
 Max total output  230L/time
 Mixing –head motor  11kw
 Total power  about 43 kw

 

 

How is the packing of the machine?

 

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

 

How many container will be needed for the whole set of machine?

 

For the standard 7 groups of Semi-Automatic continous foam machine Total one containers is enough 1*40HQ. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

We will try the best way to pack all the machine well and also save the freight cost.

 

 

Our Services

 

1. We will help to design the layout of the machine that put in your factory.

 

2. We will send 2-4 experience engineers to install and testing the machines.

 

3. We will teach your engineer how to operate the machine and how to maintain the machines.

 

4. We will give you the machine operation manual and the best formulation for target products that you are going to make.

 

5. We will help to buy the best raw material for making the foam if you needed.

 

 

FAQ:

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

 

 

 

The main part of the machine

 

 

 

 

Total: 0 [Show All]  Related Reviews
 
More »Our Others Products

[ ProductsSearch ]  [ Add To Favourite ]  [ Tell Friends ]  [ Print Content ]  [ Violation Report ]  [ Close Window ]