During the pouring process of the second lining concrete, one side of the two ends of the trolley is in contact with the already formed concrete, and it is not necessary to block, and the other side is empty, and a plug template is required.
LINING TROLLEY PLUG STEEL TEMPLATE ADVANTAGES
Our company’s plugging plate adopts a plugging plate with a screw. Compared with the previous method of using the wooden plug, the steel plug can hold the water-stopping belt more firmly and avoid the water-stop bending caused by the old construction. The nail is empty. Disassembly and damage of water leakage, saving wood cost, reducing the safety risk of cutting wood in construction, installation and disassembly is faster and more convenient, more effective to ensure the quality of the project, improve construction and shorten the construction period.
......
For more information about lining trolley plug steel template, please visit:https://www.gf-bridge-tunnel.com/products/tunnel-lining-trolley-accessories/lining-trolley-plug-steel-template/