RYMAX Wall Gap Sealant

Click image to view original image
Brand: RYMAX
型号: RYMAX Wall Gap Filling | Wall Joint | Gap Sealant
规格: 5, 15, 30kg/barrel
Price: Negotiable
Min.Order:
Supply
Delivery: Shipment within 3 days since the date of payment
Address: China
Valid until: 2032-04-19
Updated on: 2015-06-10 14:22
Hits: 1375760
Enquiry
Company Detail
 
 
Details

RYMAX Wall Gap Filling | Wall Joint | Gap Sealant


RYMAX Wall Gap Filling | Wall Joint | Gap Sealant -> gzrymax@gmail.com

RYMAX Wall Gap Filling is made by high-quality raw materials with the formula from USA and production technology from EU. It was developed according to different environment requirements and it carries the features of stable, easy-use, environment-friendly.

Features:
1. No need punch tape and self-adhesive tape, easy and quick construction. (It will be better if self-adhesive tape is used.)
2. Strong adhesive force, effectively avoid gap craze & layer separation of boards.
3. "Green" gap filling materials, no harm to human health.
Technical Data:
ITEM UNIT DATA
Component Single component
Appearance Paste
Type semiflex
Usage Humid RH 2%~98%
Density G/cm3 about 1.5
Packing kg/barrel 5, 10, 15, 30
Storage month 10 months in cool place
dro dripless (20oC, 1010mm) mm <2
Adhesive strength N/mm2 28
Surface dry(20oC, 80%RH) min about 30
Dry speed(20oC, 80%RH) mm/h 6.2/18
Bonding strength Mpa >1.3
Bending strength N/mm2 >12 (206o bended when break)
N/mm2 >60
Usage temperature oC -10~+45
Tensile strength Mpa >0.6
Max bearing temperature oC +130
Construction temperature oC >+10
Construction Usage
Right angle kg/m2 0.08~0.13
Chamfer angle kg/m2 0.18~0.20
Construction Method:
1. Clean the gap, it will be better to brush white latex once after that.
2. Stir before use, if the gap is less than 2~3mm, extend the gap with tool and then fill the filler up to the Light Steel Keel, fully cover the surface.
3. After the filler fully dry (about 18hours), plain the board surface.
Caution:
1. The filler dries slow, multi-filling is not allowed in order to keep the coagulation effect.
2. Only after 18 hours fully dry, next step can be processed.
3. Donot mix with the other materials (e.g. Gypsum powder, talcum powder, etc.)
4. Seal storage for unused filler.
5. If it had dried up after long time storage, fill about 1cm height water, stir with suitable tool when it return soft after soak, it can be used again after well distributed.

 
Total: 0 [Show All]  Related Reviews
 
More »Our Others Products

[ ProductsSearch ]  [ Add To Favourite ]  [ Tell Friends ]  [ Print Content ]  [ Violation Report ]  [ Close Window ]