PostYou are now at: Home » Products » Computer Products »

Zinc plating tubes 304 steel sand casting parts shell mold pouring

Click image to view original image
Brand: tubes
Price: 1000.00USD/Piece
Min.Order:
Supply
Delivery: Shipment within 3 days since the date of payment
Address: China
Valid until: Never Expire
Updated on: 2017-10-11 18:03
Hits: 11495
Enquiry
Company Detail
 
 
Details

tubes

Zinc plating tubes 304 steel sand casting parts shell mold pouring

Description

Sand casting is different from investment casting, different in procedures, tolerances and surface. The procedures of sand casting are shell mold, pouring, after treatment and package. The tolerances are bigger than investment casting, and surface is more rough.

 

Item

Description
Product Name tubes
Working Process Tooling make, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging
Material Stainless steel 304
Surface Treatment According to the requirement of customer
Application(Products cope) machine
Quality Control ISO9001, TS16949
Thickness Only to raw casting, more than 4mm
File Format Solidworks,Pro/Engineer,Auto CAD,PDF,JPG
Service 24-hour reply to customers enquiry
Inspection IQC, IPQC,FQC,QA
Mould Depend on customers require to make the mould.
Sample confirmation Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied.
Packing Inner Plastic Bag; Outer Standard Carton Box,Or according to customers requirements

 

Payment & Shipping Terms:

Minimum Order Quantity: 400
Price: Quoted per see the drawing or sample
Delivery Time: 10-15 working days after received PO
Payment Terms: T/T, L/C
Supply Ability: 10,000pcs per month

 

FAQ:

Q: Who Are We?

1.We are a factory do the casting for more than 10 years.

2.Aroud more than 200 workers and 3000 square meter workshop

3.Customizing services, OEM services and good after services, etc.

 

Q: Where is your factory located? How can I visit there?

A: Our factory is located in ningbo city, zhejiang Province, China, near Shang hai. You can fly to Shanghai Pudong airport directly.

 

Q: What is the payment?

We prefer T/T, and also L/C if you want, the way of payment we can discuss.

 

Q: What is the lead time?

1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.

2. If do the mass production, the lead time will be with 20 working days after receiving the PO.

 

GOOD SERVICE:

We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.

 

LOWER PRICE:

The price of our products is reasonable and competitive, and we can discuss if you want.

 

Why should you choose us?

1. We can do the part according to your drawing.

2. Rich experience and good technology support ( with senior and professional engineers with more than 7 years experience).

3. 100% inspection before delivery.

4. Competitive price with high quality.

5. Convenient transportation ( port: Ningbo, Shanghai)

6. Better operators in the office doing the export, who have done export business for more than 10 years, have good relationship with custom and shipping companies.

 

Strict inspection we do during operation

1. We have specialized QC testers to check the products quality according to different customers.

2. We have IQC to check the dimensions and surface of the incoming material.

3. We have PQC to inspect full-course during the processing

4. We have FQC to inspect all the plating products from outsides and make the 100% inspection before the shipments

5. We are willing to provide with sample for quality and function testing. We are a certified firm with TS16949. Our products are excellent in quality and reasonable in price.

 

How to test the part?

 

1. Before pouring, we will test the material and do the material report.

2. After Pouring, we will choose 10-20 parts per furnace to do the measurement.

3. When doing the after treatment, we will measure some of the parts per day.

4. After after-treatment, we will use testing toolings to test every parts.

5. Before shippment, we will test 5 parts or the quantity customer want to do the report, and will send the material report and meausrement report together with productions to customer.

Total: 0 [Show All]  Related Reviews
 
More »Our Others Products

[ ProductsSearch ]  [ Add To Favourite ]  [ Tell Friends ]  [ Print Content ]  [ Violation Report ]  [ Close Window ]